DFS (Design for Safety)

SAMOOCM identifies the risks in construction earlier in the design phase to forge
a safety management system for the whole process of construction.

DFS Team operation
A dedicated team organized for each type of construction consisting of experts
  • Design/
    construction
  • Civil engineering/
    landscaping
  • Machine/
    firefighting
  • Quality/safety/
    environment
  • Electric/
    communication

Investigates an effective risk control method to prevent safety accidents in the working design phase.

DFS System application
Safety inspection in the design phase
Removes risks over 50%
Similar application cases
DFS Program Tool
TF Team that participated in 9 processes
90 risks identified
52% revision in the design phase
48% revision in
the construction phase
Effect-proven DFS system application

Removes risks in advance in the design phase.

Press release and findings of study
Removes risks in advance in the design phase.
삼우씨엠 언론보도자료 및 연구결과물 기사
SAMOOCM’s DFS
study and findings

* DFS(Design for Safety)

  • Domestic and overseas DFS application report
    Domestic and overseas DFS application report
  • dbp. England
    dbp. England
  • Design stability review report
    Design stability
    review report
  • WORK SAFE BC, Canada
    WORK SAFE BC, Canada
  • Pfd. USA
    Pfd.
    United States of America